New Wastewater Connection – Builders
Apply:
Apply for Service and Pay Tap Application Fees
Manuals:
Download the Wastewater Policy Manual
Specs:
Check the specifications.
Wastewater Specifications
The specifications are to be used by the Developer’s Design Engineer in
the preparation of construction documents for the construction of sanitary sewer systems to be owned, operated and maintained by Integra Water, LLC.
All systems must be developed using these specifications. Developers are
responsible for setting up initial electric and/or water service for all
water wells and pump stations.
*EFFECTIVE IMMEDIATELY (August 5, 2024): Final plats will not be signed
without an operational and approved pump station or completed force mains.
No bypass pumps or bonds will be accepted.
Wastewater Details Updated 01/02/24
Wastewater Specs Updated 01/02/24
Grinder Pump Electrical Panel Installation Guide
Grinder Pump Layout Detail 03/21/22
E-One Start Up Sheet 12/13/22
Grinder Pump Electrical Panel Installation Guide 09/07/22
Please note that no other grinder pumps besides e-one grinder pumps will be approved by operations. Our system is specifically designed for the use of these pumps. Please contact Carney Holland with Morrow Water at (205) 789-4556 or cholland@morrowwater.com for purchasing details.
To schedule preconstruction meetings, system testing, construction inspections, pump station start-ups, and/or tap-ons to the system specifically within Madison and Limestone Counties, please schedule an appointment online.